Cesar Chavez School

Connecting the Past to the Present

New Elevator Corridor

We were presented with an interesting challenge to bridge the present with the past. Oh’s connective design solution of an elevator corridor addition connected three floors and complimented the features of the existing buildings. Conducted in two summer construction phases, this project also remedied accessibility compliance and other minor repairs.

  • Date : 2016
  • Client : Portland Public Schools
  • Status : Completed
  • Location : Portland, Oregon