rotate background

Reynolds School District High School

Providing Inspired Spaces and a Safety Environment for Cultural Inclusion.

Reinvestment in our Youth

OHP+D led an interdisciplinary team of assessors, which included architectural, structural, mechanical and electrical engineers, and performed inspections of the major building systems at 28 sites. Our findings were compiled into a comprehensive facility condition assessment report. Subsequent concepts of each facility for long range planning were developed and prioritized. Immediate needs were incorporated into the long range plan with summer improvement projects completed on a number of facilities, including the High School renovations, which included redesign of the gym lobby and locker rooms and ADA accessibility upgrades.  OHP+D led outreach efforts with the diverse community and stakeholder groups, and assisted in bond planning in preparation for a $125M bond passed in 2015.

 

  • Date : 2014
  • Client : Reynolds School District
  • Status : Completed
  • Location :  Troutdale, Oregon
  • /